FAA 2026-02-01
Effective 2026-02-26
· Applies to:
Airbus EC135
Cross-jurisdiction flags
Timing differs from EASA by 825 days
FAA effective 2026-02-26; EASA 2023-0197 effective 2023-11-24
Compliance timing differs from EASA
This AD: Per EASA 2023-0197 schedule | Peer: Per ASB schedule
Cross-references
EASA
2023-0197
Tail rotor drive – flexible couplings and tail rotor shafts inspection (origin AD; FAA adopted as 2026-02-01).
Subject
Tail rotor drive shaft – flexible coupling axial-displacement inspection and replacement. | Note: Timing-gap example: EASA 2023-0197 effective 2023-11-24; FAA 2026-02-01 effective 2026-02-26 — ~27-month lag.
Compliance time
Per EASA 2023-0197 schedule
Referenced Service Bulletins
- AH ASB EC135-65-13-0001 Issue 001 (2023-03-14)
Source: FAA · scraped 2026-05-06 23:01 UTC