FAA 2025-18-04
Effective 2025-10-21
· Applies to:
Airbus EC145
Cross-jurisdiction flags
Timing differs from EASA by 928 days
FAA effective 2025-10-21; EASA 2023-0066 effective 2023-04-07
Cross-references
EASA
2023-0066
EASA AD 2023-0066
Subject
The FAA is adopting a new airworthiness directive (AD) for all Airbus Helicopters Deutschland GmbH Model EC135P1, EC135P2, EC135P2+, EC135P3, EC135T1, EC135T2, EC135T2+, EC135T3, EC635T2+, MBB-BK 117 C-2, MBB-BK 117 D-2, and MBB-BK 117 D-3 helicopters. This AD was prompted by a review of design data and the determination for recalculation of accumulated hoist boom cycles (cycles) and repetitive inspections. This AD requires determining the total cycles of certain hoist boom assemblies, inspecting those hoist boom assemblies, and depending on the results, taking corrective action. This AD also prohibits installing those hoist boom assemblies unless certain requirements are met. The FAA is issuing this AD to address the unsafe condition on these products.
Compliance time
before further flight, replace the hoist boom assembly (which includes the support assembly) with a serviceable part, as defined in EASA AD 2023-0066''.
Source: FAA · scraped 2026-06-21 04:02 UTC